Baldwin Residence · Second floor · Baths
Bath 1
October 30 set · Part II · 6 current sheets
Needs attention1 project note
Current issueOctober 30 set
Current coordination email · added November 2, 2026
Needs attention
- Medicine cabinet niches — Tom and Hunter: Confirm whether all medicine cabinet niches in Bath 1 are ready for final measurements; if not, confirm when they will be ready.
Current reference set · October 30, 2026
Current drawings
Tap any drawing to open it full size for closer zooming.
Open current specification schedule ↗01
Floor plans
Plan views and room layouts.
01
Full size ↗Bath 1 · Floor PlanOctober 30 set · Part II · sheet 224 · PDF page 93

02
Elevations - doors closed
Finished exterior cabinet elevations with doors and drawer fronts shown.
01
Full size ↗Bath 1 · ElevationOctober 30 set · Part II · sheet 225 · PDF page 94

02
Full size ↗Bath 1 · Side Panel ElevationsOctober 30 set · Part II · sheet 226 · PDF page 95

01
Cabinet interiors - doors hidden
Interior storage layouts with cabinet doors removed from view.
01
Full size ↗Bath 1 · Elevation - InteriorOctober 30 set · Part II · sheet 227 · PDF page 96

02
Details
Ceiling, moulding, door, hardware, section, and fabrication details.
01
Full size ↗Bath 1 · Moulding DetailsOctober 30 set · Part II · sheet 228 · PDF page 97

02
Full size ↗Bath 1 · Door DetailsOctober 30 set · Part II · sheet 229 · PDF page 98

