Baldwin Residence · First floor · Utility & service
Mud Room Hall
October 30 set · Part I · 8 current sheets
Needs attention1 project note
Current issueOctober 30 set
Current coordination email · added November 2, 2026
Needs attention
- Brass finish — Hali and Meg: Confirm the brass finish for the Mud Room Hall wire mesh.
Current reference set · October 30, 2026
Current drawings
Tap any drawing to open it full size for closer zooming.
Open current specification schedule ↗01
Floor plans
Plan views and room layouts.
01
Full size ↗Mud Room Hall · Floor PlanOctober 30 set · Part I · sheet 99 · PDF page 103

02
Elevations - doors closed
Finished exterior cabinet elevations with doors and drawer fronts shown.
01
Full size ↗Mud Room Hall · ElevationOctober 30 set · Part I · sheet 100 · PDF page 104

02
Full size ↗Mud Room Hall · Side Panel ElevationOctober 30 set · Part I · sheet 102 · PDF page 106

01
Cabinet interiors - doors hidden
Interior storage layouts with cabinet doors removed from view.
01
Full size ↗Mud Room Hall · Elevation - InteriorOctober 30 set · Part I · sheet 101 · PDF page 105

01
3D perspective views
Perspective views showing the assembled cabinetry in the room.
01
Full size ↗Mud Room Hall · Elevation PerspectiveOctober 30 set · Part I · sheet 106 · PDF page 110

03
Details
Ceiling, moulding, door, hardware, section, and fabrication details.
01
Full size ↗Mud Room Hall · Moulding DetailsOctober 30 set · Part I · sheet 103 · PDF page 107

02
Full size ↗Mud Room Hall · Lower Cabinet Door DetailsOctober 30 set · Part I · sheet 104 · PDF page 108

03
Full size ↗Mud Room Hall · Upper Cabinet Door DetailsOctober 30 set · Part I · sheet 105 · PDF page 109

